LESCO New Connection: Documents, Fees and Step-by-Step Process
In This Guide
1. What a new connection means 2. Required documents 3. Step-by-step process 4. Connection types and meters 5. Fees and timeline 6. Tenants, shops and special cases 7. Common delays and fixes 8. FAQsWhat Is a LESCO New Connection?
A LESCO new connection is an official electricity supply connection for a house, shop, office, factory or farm in LESCO’s service area. LESCO, the Lahore Electric Supply Company, covers Lahore, Kasur, Okara, Sheikhupura and Nankana Sahib, and works under the rules of NEPRA, Pakistan’s power regulator.
Once connected, you get your own meter and a unique 14-digit reference number. That number is used on every bill, so it is worth saving. You can later use it to view your LESCO duplicate bill and make payments.
Who needs to apply?
- Owners of newly built homes, plots or commercial units.
- Buyers of property without an active meter.
- Shop and factory owners starting a business.
- Tenants who need a separate meter, with the owner’s consent.
- Consumers who want a higher load or three-phase supply.
Documents Required for a LESCO New Connection
Requirements can vary slightly by category and sub-division, but the core list is similar for most applicants.
| Document | Why it is needed |
|---|---|
| CNIC copy of applicant | Identity verification |
| Proof of ownership (registry, fard, allotment letter, transfer letter) | Confirms the right to the property |
| Wiring test report from a licensed electrical contractor | Shows the internal wiring is safe |
| Application form | Records your load and category |
| Passport-size photographs | Applicant record |
| Owner’s consent and rent agreement (tenants) | Permission to install a meter |
| Commercial or industrial papers (if relevant) | Business registration and load details |
How to Apply for a LESCO New Connection, Step by Step
- Complete your wiring. Hire a licensed electrical contractor, finish the internal wiring and get the test report.
- Collect your documents. Use the table above as your checklist.
- Submit the application. Apply through LESCO’s online channel, or hand it in at your local sub-division office.
- Site inspection. A LESCO representative visits to verify the address, load and wiring.
- Receive the demand notice. This lists the security deposit and service charges.
- Pay at a bank. Use the voucher at a designated bank or an accepted digital channel. Keep the receipt.
- Meter installation. LESCO installs the meter and your connection is activated.
- Check your first bill. Confirm your reference number, load and category are correct.
Always keep your application number. It lets you follow up with the sub-division or helpline 118.
Types of LESCO Connections and Meters
LESCO classifies connections by use. The category decides your tariff, so choose accurately.
| Category | Used for | Typical supply |
|---|---|---|
| Domestic | Houses and apartments | Single-phase |
| Commercial | Shops, offices, plazas | Single or three-phase |
| Industrial | Factories and workshops | Three-phase |
| Agricultural | Tube wells and farms | Three-phase |
Single-phase vs three-phase
Single-phase supply suits normal household use such as lights, fans, fridges and a few air conditioners. Three-phase supply is for heavier loads like large ACs together, machines or motors. If you plan to add more load later, mention it at the start to avoid redoing the connection.
Solar and net metering
If you plan to install solar panels, ask about net metering at the same time. Net metering allows eligible consumers to send surplus electricity back to the grid. Rules and eligibility are set by NEPRA and LESCO, so confirm the current process with your sub-division.
LESCO New Connection Fees and Timeline
There is no single fixed price. The amount depends on your category, sanctioned load and phase. Your demand notice normally includes:
- Security deposit: held against future bills.
- Service or connection charges: for processing and installation.
- Meter and material costs: where applicable.
Pay only the amount printed on the official demand notice, and only through approved bank channels. Rates are revised from time to time, so confirm the current figures with LESCO before you pay.
How long does it take?
Most domestic connections are completed within a few days to a few weeks after fee payment. Commercial and industrial connections can take longer, especially if a transformer or line extension is needed. NEPRA has set service standards for connection times, so you can follow up if the deadline is missed.
Special Cases: Tenants, Shops and Plots Without Meters
Can a tenant apply?
Yes. A tenant should bring the owner’s written consent, a copy of the owner’s ownership proof, the rent agreement and their own CNIC. Many tenants prefer their own meter so that bills stay under their control.
Shops and plazas
Commercial users should apply under the commercial category, which has its own tariff. Declaring a domestic connection for business use can lead to penalties during inspection.
Old property with unpaid dues
If the earlier owner left unpaid bills, LESCO may ask for clearance before a new connection. Before buying property, ask the seller for a recent paid bill and check if the LESCO bill is paid or not.
Name change or load change
If you bought a house with an existing meter, apply for a name change instead of a new connection. For more load, apply for a load extension.
Common Reasons for Delays and How to Avoid Them
| Problem | Why it happens | Fix |
|---|---|---|
| Application returned | Missing or unclear documents | Re-submit with a full set of copies |
| Inspection pending | Wrong address or no access | Share a landmark and phone number |
| Wiring rejected | Unsafe or incomplete work | Hire a licensed contractor to correct it |
| Meter not installed after payment | Stock or staff delay | Quote your application number to the sub-division |
| Extra money demanded | Informal agents | Pay only the official demand notice at a bank |
Expert insight
The smoothest applications we see have three things in common: complete documents on day one, a licensed contractor’s clean test report, and the receipt kept safely after payment. Avoid middlemen who promise a “fast” connection for extra cash. Official fees are paid only through bank vouchers, and an informal payment gives you no receipt to prove it.
After activation, learn the LESCO bill payment methods so your first bill is paid on time.
Key Takeaways
- A LESCO new connection needs a CNIC, ownership proof and a wiring test report.
- The steps are application, inspection, demand notice, bank payment and meter installation.
- Pick the right category, because it sets your tariff.
- Pay only official demand notices through approved channels.
- Tenants need the owner’s written consent.
- Keep your application number and receipts until the meter is working.
Frequently Asked Questions About LESCO New Connection
How can I apply for a new LESCO connection?
Submit your application online or at your sub-division with your CNIC, ownership proof and wiring test report. Pay the demand notice at a bank and wait for installation.
What documents are required?
A CNIC copy, ownership proof, wiring test report, application form and photographs. Tenants also need the owner’s consent.
How long does it take to get a connection?
Often a few days to a few weeks after fees are paid, depending on load and site conditions.
How much does a new connection cost?
It depends on category and load. Your demand notice lists the exact charges, so confirm them with LESCO.
Can a tenant get a LESCO connection?
Yes, with the owner’s written consent, ownership documents, rent agreement and the tenant’s CNIC.
What should I do after my connection is activated?
Save your reference number, check your first bill and set up a payment method before the due date.
About the Author
Written by the LESCO Online Bill editorial team. We have spent years helping consumers across Punjab understand electricity bills, connections and payment channels. This guide draws on information from LESCO, the Power Division and NEPRA. Rules and fees change, so confirm final details with your LESCO sub-division before applying.
Conclusion
Getting a LESCO new connection is straightforward when you prepare properly: finish safe wiring, gather your documents, apply, pay the official demand notice and keep every receipt. Do that and your meter will be up and running without drama.